Bike
Trail (Path, Rail-Trail) |
|||
|
|||
Cycling Facilities |
|||
| Image source - Trail official web site | Trail
Map ![]() |
||
| Trail Official Web Sites
- http://www.dnr.state.wi.us/org/land/parks/specific/capacity/
- for description of trail and amenities |
|||
| Updated - 2006-09-03 | |||
| Connector - Military Ridge State Park Trail to Capital City State Trail | On-road bike lane connection. | ||
| Trail plowed only sign. | |||
| Crossing a Major Highway | |||
| Alignment | Meandering through ravines and populated single housing areas (higher priced). | ||
| Difficult Intersection Design | Lack of direction and destination signage certainly was a problem along the way. | ||
| Opportunities for Enhancing the Trail |
|
||
| Signage - Destination, Direction | • Trail map and signage at western terminus of trail indicating connection with the Military Ridge State Park Trail | ||
| • Additional trail name signage along trail making cyclists more confident that they are on the right trail. | |||
| • Additional direction signage along trail where direction changes. | |||
| Intersection Design | • Trail should be level at intersections for at least one bike length, especially when stop signs on the trail. | ||
| Intersection Design - Signalized | • Some intersections needed to be signalized for trail crossing, recognizing the traffic volumes on the road. | ||
![]() |
![]() |
||